Tyndrum, Transfer Watermain

Client Name: Scottish Water

Project Type:Transfer water main – ductile iron & hppe pipe – 4km total

Image Gallery (click to enlarge):

Further Excavation

Further Excavation.jpg

Initial Excavation

Initial Excavation.jpg

Reinstatement

Reinstatement.jpg

Works Description:

  • Watermain through – busy tourist village (Tyndrum) 
  • 1.5 km of the West Highland Way 

Approximate Value: £390,000.00

Duration: 6 Months

Project Challenges: 

  • excavating rock below soft moorland 
  • dealing with surface run – off close to river in very wet weather conditions 
  • working within Loch Lomond & Trossachs National Park 
  • excavating trench alongside the West Highland Way national footpath 
  • pressure testing to 25 bar test pressure