Works Description:
- strip & process stone from designated quarry
- reduce existing ground level
- transport stone from quarry, spread and compact along the length of the job
- install culverts up to 1800 diameter
Approximate Value: £500,000.00
Duration: 7 Months
Project Challenges:
- working within Europes largest operational windfarm
- working in very soft ground conditions
- operating in close proximity to 11kv power lines